Unloading Supplies         
Crews from Delta Railroad Construction are unloading materials for replacement tracks for the SWP Railroad in Wheeler Bottom. It looks like at least some of it will be built with pre-assembled track panels. The worker to the left is using a small spike driving machine.
Date: 5/20/2015 Location: Wheeler, PA   Map Show Wheeler on a rail map Views: 113 Collection Of:   Curt Beal
Author:  Curt Beal
Unloading Supplies
Picture Categories: Action This picture is part of album:  Southwest Pennsylvania Railroad- Track Upgrades
Share
User Comments Contributor does not allow comments on their photos.
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4215385