SWP Railroad Improvements (6)         
The tamper-aligner has an entourage of six workers as it measures the rails and adjusts the ballast accordingly. It made a pass every time another load of ballast was dropped. This work is being done by Delta Railroad Contractors for the Southwest Pennsylvania Railroad in Wheeler Bottom, Dunbar Township, PA.
Date: 7/12/2015 Location: Wheeler, PA   Map Show Wheeler on a rail map Views: 67 Collection Of:   Curt Beal
Author:  Curt Beal
SWP Railroad Improvements (6)
Picture Categories: Track,Action This picture is part of album:  Southwest Pennsylvania Railroad- Track Upgrades
Share
User Comments Contributor does not allow comments on their photos.
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4329216