The engines are ready to decouple from this tank car, go back through the switch and back down against the train on the SWP interchange. The tank car had to be moved in order to fit two engines on the track. WE 106 would come up with another train, couple to the tank car, and move the train far enough up to clear the switch. It was left overnight. |